In PAKRI we are here for the target; we deliver on time what we have agreed and we have and we are synergy with our clients.
Impossible was to complete the first stage of the renovation of our building complex nr 2 (ca 5500m2) from scratch in one month: construction of part of the roof with new 31 meter and ca 3,5 ton metal girder; new windows; new electrical connection (including 400A main switchboard, all cabling); new industrial 4m height doors and facade new look etc.
With PAKRI committed management and our good clients we are almost there to deliver the target on time. We are making impossible possible.
Very busy time in construction 18hours a day 7 days a week.
Picture about the situation where 3 cranes and 2 dump trucks working in the same time in different assignments:
Lift off of the new 31 meter and ca 3,5 ton metal girder, plus lift down after 5,5hours
Electrical cabling, industrial door installation